Visitor/Education Centre Working Party - 13th January 2007 

Report by Jeff Burroughs

The steps to the lower jetty were made good with new cross rails and side rails fitted along with the steps being backfilled with hardcore to form a safe and secure set of steps. Both the upper and lower jetties were covered in wire mesh to help with the grip.

A new cover was constructed along with the mounting frame being fixed in the ground for the outside charging point, kindly donated by the Environment Agency.

The access ramp to the front of the building was modified slightly and this will now go down towards the lock and a new set of steps will lead down to the car park area adjacent to the building. This ramp is soon to be fitted with the new surface suitable for wheelchair access.

We would like to see more willing volunteers and welcome any assistance. Details of future working parties